Asset One supported Anasuria Operating Company across a multi-workstream improvement programme covering maintenance optimisation, materials management, asset data, equipment criticality, governance, workflows and ERP transformation.

The work combined offshore execution with maintenance engineering, inventory improvement and management system development, ensuring that physical improvements, business processes, data and Maximo development were addressed together.

Project Facts

Engagement overview

Client

Anasuria Operating Company

Asset

Anasuria FPSO

Sector

Offshore Oil & Gas

Expertise

Maintenance Excellence, Inventory Management, Asset Data, ERP / EAM Transformation, Management Systems

The Challenge

What needed to be addressed

The improvement programme involved several connected issues rather than a single isolated problem.

Maintenance plans required review and optimisation. Maintenance backlog and work management arrangements required improvement. Equipment criticality and maintenance decisions needed stronger alignment. Materials and spare parts information required review and improvement. Offshore storage locations required physical review, rationalisation and stock verification. Item Master information required creation and improvement within Maximo. Maintenance, inventory and asset data workflows needed to be clearly defined.

The organisation was also progressing from Maximo 7.6 towards Maximo Application Suite, requiring technical input to ensure that system development reflected the operating model and engineering requirements.

The key challenge was ensuring that maintenance, materials, asset data, workflows and ERP configuration were treated as one connected management system rather than separate improvement projects.

Our Approach

How we approached the work

Asset One provided practical support across both offshore and onshore workstreams. The approach included:

  • Review of existing maintenance arrangements and maintenance performance
  • Maintenance plan review and optimisation
  • Equipment criticality review
  • Maintenance backlog rationalisation
  • Review of safety and environmentally critical element maintenance requirements
  • Materials and spare parts review
  • Physical review of the main stores and supplementary storage areas
  • Identification and segregation of obsolete and scrap materials
  • Storage location reorganisation
  • Physical stock counting and verification
  • Review and creation of Item Master information
  • Improvement of equipment, maintenance and inventory data
  • Development and revision of maintenance and materials workflows
  • Governance documentation development
  • Support to Maximo improvement and the transition from Maximo 7.6 to MAS
What We Delivered

Defined deliverables

01

Maintenance optimisation

Review and optimisation of maintenance requirements and existing maintenance plans.

02

Criticality review

Review of equipment criticality to improve alignment between asset importance, maintenance strategy and operational risk.

03

Backlog rationalisation

Structured review of maintenance backlog to improve prioritisation and remove inappropriate or obsolete work.

04

Inventory improvement

Physical stock verification, storage rationalisation and improvement of inventory information.

05

Item Master development

Creation and improvement of structured Item Master information for use within Maximo.

06

Workflow development

Development and revision of workflows governing maintenance, materials, asset data and associated ERP processes.

07

ERP transformation support

Technical support to ensure that Maximo development and MAS transition decisions reflected operational and engineering requirements.

08

Governance documentation

Development and revision of the procedures and governance documents required to support consistent execution.

Technical Scope

Connected system

Physical Assets
Asset Register & Criticality
Maintenance Strategy
Maintenance Plans
Work Management
Materials & Spares
Maximo Data & Functionality
Workflows & Governance

The work recognised that maintenance performance cannot be improved by changing PM routines alone. Equipment hierarchy, criticality, maintenance strategy, work management, spare parts, inventory data, ERP functionality and governance must operate as a connected system.

Outcomes

What the work achieved

The programme provided Anasuria with:

  • 01Rationalised and optimised maintenance requirements
  • 02Improved alignment between equipment criticality and maintenance decisions
  • 03Improved maintenance backlog quality
  • 04Better visibility and control of offshore materials
  • 05Verified physical inventory information
  • 06Improved Item Master and materials data
  • 07Clearer maintenance and materials workflows
  • 08Stronger governance documentation
  • 09Technical alignment between engineering requirements and ERP transformation
  • 10A more integrated approach to equipment, maintenance, inventory, data and systems

27%

reduction in maintenance requirements

£1.5m+

identified savings

Get in touch

Need to improve maintenance, inventory or ERP performance?

We help organisations understand how equipment, maintenance, materials, data, workflows and systems interact — then fix the problems at the source.