CASE STUDY | OFFSHORE DRILLING | FABRIC MAINTENANCE

Prospector 1 fabric maintenance campaign — project managed to 100% completion

Project managing a major rig-wide fabric maintenance campaign during a Rotterdam yard stay.

Asset One provided project management support to Borr Drilling for a major fabric maintenance campaign on the Prospector 1 jack-up drilling rig during its stay in Rotterdam.

The project included handrail replacement, deck cleaning, surface preparation, protective coating and walkway reinstatement across multiple rig areas. Asset One coordinated the work through to 100% completion.

Project Facts

Engagement overview

Client

Borr Drilling

Asset

Prospector 1

Location

Rotterdam, Netherlands

Industry

Offshore Drilling

Asset One Role

Project Management

Services Delivered

Project Management, Contractor Coordination, Progress Monitoring, Cost Control, Technical Assurance

The Challenge

What needed to be addressed

The campaign involved multiple contractors, suppliers and simultaneous workfronts across the rig.

The work had to be carefully planned and coordinated to maintain safe access, manage changing priorities and ensure progress remained visible throughout the yard stay.

Our Approach

How we approached the work

Asset One acted as the project management interface between Borr Drilling, the rig team, contractors, suppliers and the yard. Our role included:

  • Coordinating contractors and suppliers
  • Prioritising and sequencing work
  • Monitoring daily progress
  • Tracking cost and commercial performance
  • Managing technical and quality issues
  • Reporting progress to the client
  • Maintaining clear visibility of outstanding work
What We Delivered

Defined deliverables

01

Handrail replacement

Rig-wide replacement of degraded handrails across multiple areas.

02

Main deck cleaning

Cleaning of main deck surfaces ahead of preparation and coating.

03

Surface preparation

Surface preparation and blasting to ready substrates for coating.

04

Protective coating

Application of protective coating to preserve and protect rig steelwork.

05

Walkway reinstatement

Walkway marking and anti-slip coating to reinstate safe access routes.

06

Final inspection

Final inspection and close-out of remaining defects and punch-list items.

Technical Scope

Connected system

Plan & Sequence
Contractor Coordination
Execution
Progress & Cost Control
100% Completion

This project demonstrated Asset One's ability to manage complex maintenance campaigns in live offshore and shipyard environments. By combining practical technical knowledge with disciplined project management, Asset One provided clear coordination, control and reporting from execution through to final completion.

Outcomes

What the work achieved

All planned scopes were completed to 100%. The project delivered:

  • 01Improved personnel safety
  • 02Renewed access and barrier systems
  • 03Improved corrosion protection
  • 04Safer and clearer walkways
  • 05Better visibility of project progress
  • 06Coordinated delivery across multiple contractors
  • 07Improved readiness for continued operations

480 m

Handrail replacement scope

4,000 m²

Cleaning and surface preparation

4,000 m²

Painting and coating

100%

Planned scope completed